Saturday's projects included getting the overhang ladders, the drip edge and the weathershield, on the roof, all necessary before we could cut the hole in the upstairs wall and begin to build the long awaited stairs to the Pub. Eric also installed the digital lock system in the entry door along with a deadbolt so the stair tower is now secure. The first picture provides a great depiction of just how much dust went flying about the Lodge as we cut through the thick walls. First the sheetrock, then 2" of polyiso, then a layer of T&G pine, then another layer of 2" polyiso then strapping and lastly the outside 3/4 inch shiplap siding! It was a major job to get through it all even with the longest reciprocating saw blade we owned. At one point, I suggested that Eric go get the CHAINSAW! We were conservative with the first hole we cut as we weren't 100% certain of just where the roof rafters of the stair tower would lie. We did get stuck with a bit of an angled corner which although not ideal, allowed us not to have to raise the roof even higher than it is, which would have meant marrying it into the roof of the Lodge instead of the framing all coming in under the eaves. I feel confident that we can make it look good when we trim it out. The hole being cut looks SO strange. When we did our nightly Garden Tour, we made sure to walk pass the two large windows on the back of the stairtower. It was incredibly weird to look in and see both levels of the building. This morning we were greeted with the morning sunrise streaming into the new space. We are going to keep the walls off-white so we will maximize that sunlight. Now we can begin to calculate the exact rise and run of the stairs instead of the rough calculations we had to make with the outer wall still there. What a wonderful thing it will be to have that access, not to mention not having the worry of the melting snow running under the Pub door and into the Pub. Last night we cheated a bit and propped a ladder up so we could get the feeling of the stairs. The next project will have to be closing in the eaves as those pesky mosquitos are clever enough to see they have an easy access. We also must build out the windows to allow for the 2" polyiso we will put on the outside before the siding. I can work on insulating the back wall in the meantime. We also figured out the wiring so we can get that in place so the inside insulation can be put in place as well.
No comments:
Post a Comment